Energy Management
Electrical Panel Installation: Long Duc & Tan Cang
-
Execution Period
September 28 – 30, 2025
-
Location
KCN Long Đức (Đồng Nai) & Tân Cảng Cái Mép (BR-VT)
-
Industry
Solar Energy
Key features
-
Equipment & Electrical Panel Installation
Precise installation of internal devices and signal meters inside electrical panels in strict accordance with technical design drawings.
-
Testing & System Wiring
Comprehensive verification of wiring diagrams, signal testing, and assessment of real-time operational parameters.
-
Safety Supervision & Acceptance
Collaborating closely with clients from construction to final acceptance, ensuring safe system operation compliant with industry standards.
Inspection, signal testing, and electrical panel equipment installation support for solar energy systems in Dong Nai and Ba Ria – Vung Tau, executed by the Hino Systech engineering team.
Standard Specifications
Solution Detail & Operating Principle
Project Overview
As part of renewable energy project developments, Hino Systech Vietnam successfully executed electrical equipment inspection and installation support across two key locations: Long Duc Industrial Park (Dong Nai) and Tan Cang Cai Mep (Ba Ria - Vung Tau). The project was undertaken to meet stringent energy monitoring requirements, ensuring customer systems operate reliably at peak performance.
Scope of Work
From September 28 to 30, 2025, Hino Systech's highly skilled engineering team was deployed directly on-site to execute the following core tasks:
-
Installation: Precise positioning and mounting of internal components and signal meters inside electrical panels compliant with technical design standards.
-
Testing & Measurement: Thorough review of overall wiring schematics, conducting signal measurements, and evaluating real-time operational parameters on-site.
-
System Integration: Facilitating complete connectivity of measurement devices, ensuring continuous data transmission and smooth, safe system operations.
Value Delivered
By providing dedicated support from construction to final handover, Hino Systech guarantees that all equipment operates within specified parameters with absolute safety. This project further reinforces Hino Systech Vietnam's capability to deliver comprehensive monitoring and control solutions for solar energy developments.
Inspection, signal testing, and electrical panel equipment installation support for solar energy systems in Dong Nai and Ba Ria – Vung Tau, executed by the Hino Systech engineering team.
Get a Power-Quality Survey & Switchboard Design Quote
Optimize your plant's energy costs today with a smart power-factor correction system. Hino Systech's expert engineers will run an on-site measurement survey and propose the optimal technical plan — completely free.
- Head office: Unit 1 & 2, 13th Floor, PV Oil Building, 148 Hoang Quoc Viet Street, Nghia Do Ward, Hanoi City
- Project support: hsv-sales@hino-systech.com
Related projects
-
Deployment of Solar Monitoring System for Net Zero Wooden House Model
Operation and periodic maintenance for 50MW solar power plants — 24/7 remote technical support, ensuring stable power generation performance.
Read more -
Rooftop Solar SCADA System at Sapporo Long An Plant
Upgrading line-wide control and monitoring systems for Japanese FDI clients.
Read more -
Best Pacific Hai Duong Solar Monitoring System & Control Panel
Deploying a centralized operation center for a solar energy investor with 12 distributed plants nationwide.
Read more